You don't have javascript enabled. Good luck with that.
Pencarian
PAM Jaya Lakukan Peremajaan Alat IPA Buaran

PAM Jaya Rejuvenates IPA Buaran Equipment

Perumda PAM Jaya rejuvenates Buaran Water Treatment Plant (IPA) in order to increase equipment reliability and maximum raw water absorption.

PAM JAYA strives to increase the clean water production capacity

The rejuvenation is aimed to upgrade outdated or less efficient equipment to ensure smoother and more sustainable operations such as replacing or repairing existing electrical equipment.

Senior Manager Corporate Communication & Office Director, Gatra Vaganza, said it is hoped that this equipment rejuvenation can increase the reliability and safety of the electrical system at Buaran WTP, reduce the risk of disruption or damage that could hamper production, and increase production capacity.

DWP Perumda PAM Jaya Assists Stunting Handling in South Jakarta

"PAM JAYA strives to increase the clean water production capacity at the Buaran WTP, so that it can meet the increasing clean water needs of the community," Gatra said, Sunday (6/2).

As for information, PAM JAYA carried out two main works, namely replacing coarse screens which were 32 years old and replacing fine screens which were 10 years old in the two raw water intake canals of the Buaran Water Treatment Plant which were carried out alternately 14 hours each to avoid total blackouts.

Apart from that, PAM Jaya also replaced the 20 kV incoming panels and 3.3 kV outgoing panels which were more than 15 years old, with some parts being outdated or discontinuous.

During the coarse and fine screen replacement work, he added, the water will continue to flow but the pressure will decrease.

"When replacing the coarse and fine screens, the canal conditions are dry so the raw water will decrease by around 1,100 liters per second. Screen installation is carried out alternately," he closed.

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye939 personAldi Geri Lumban Tobing
  2. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye604 personDessy Suciati
  3. 21 Parking Locations Prepared for Indonesian Independence Day Celebrations

    access_time15-08-2026 remove_red_eye531 personAldi Geri Lumban Tobing
  4. Transportation Agency Prepares Traffic Management Plan for Indonesia's 81st Anniversary Celebrations

    access_time15-08-2026 remove_red_eye511 personAldi Geri Lumban Tobing
  5. Fire Site in Utan Kayu Utara Being Cleared

    access_time11-08-2026 remove_red_eye446 personNurito